Clothing production management, from approved sample to delivered order
Specter OS runs production on the same record as the tech pack. Purchase orders, the critical path, quantities, delivery dates and costing sit on each style, and your factories work on it with you for free. No more production tracker that is out of date the day after you send it.
| Style | Description | Factory | PO | Qty | Delivery | Stage |
|---|---|---|---|---|---|---|
| SPC‑1042 | Heavyweight Tee | Fabrika Tekstil | PO‑0231 | 600 | 14 Jul | In production |
| SPC‑1088 | Denim Jacket, washed | Konya Denim | PO‑0232 | 350 | 28 Jul | Bulk fabric in |
| SPC‑1104 | Cropped Hoodie | Fabrika Tekstil | PO‑0233 | 400 | 04 Aug | PP late 3 days |
| SPC‑1119 | Ribbed Tank | Not assigned | — | — | — | Costing |
Production, on the same record as the style
Everything you need to get a collection from approved sample to delivered order. It is part of the same fashion PLM as your tech packs and samples, so nothing is copied between systems.
Purchase orders
Raise the PO against the approved style, so quantities and specs come from the same record the factory sampled from, not a copy in a separate file.
Critical path
Every milestone from lab dip to ex-factory on one timeline, with planned and actual dates, so a slip shows up before it moves the ship date.
Quantities & delivery dates
Quantities and delivery dates per order across the whole collection, so you know what lands when and which style is holding up the drop.
Costing
Each style’s costing next to its spec and BOM, so the price you approve and the PO you raise come from the same numbers.
Sample approvals
Proto, fit, PP and TOP rounds with measured values against the spec, so you can see which styles have an approved sample before they go into bulk.
Factory collaboration
Factories work on the live style for free, raise questions against the exact measurement or BOM line, and see only what you share.
From approved sample to delivered order
The production half of a style’s life, in six steps.
- 01
Approve
Sign off the PP sample against the spec, with every measured point on record.
- 02
Cost
Confirm the costing on the style from its BOM and the factory’s quote.
- 03
Order
Raise the purchase order with quantities from the approved style.
- 04
Plan
Set the critical path: bulk fabric, trims, production start, ex-factory, delivery.
- 05
Track
Follow planned against actual dates across every style in the collection.
- 06
Deliver
See what lands when, and which style is holding up the drop.
A critical path that lives on the style
A critical path, or time and action calendar, lists every milestone a style has to pass before it ships, with a planned and an actual date. In Specter OS it sits on the style itself, so a late PP sample is flagged next to the delivery it puts at risk. Planning one in a spreadsheet first? Use our free critical path template. An example for one style:
| Milestone | Planned | Actual | Status |
|---|---|---|---|
| Lab dip approval | 02 May | 04 May | Done |
| Fit sample approval | 16 May | 16 May | Done |
| PP sample approval | 06 Jun | 09 Jun | 3 days late |
| Bulk fabric in house | 13 Jun | — | At risk |
| Production start | 20 Jun | — | Planned |
| Ex-factory | 18 Jul | — | Planned |
| Delivery | 04 Aug | — | Planned |
Specter OS vs a spreadsheet production tracker
Most brands manage production in a shared spreadsheet and a lot of messages. Here is what changes.
| Spreadsheet tracker | Specter OS | |
|---|---|---|
| Purchase orders | A PO template filled in by hand, emailed as a PDF | Raised from the approved style, with its quantities and specs |
| Critical path | A tracker tab someone has to remember to update | Planned and actual dates on every style, late milestones flagged |
| Delivery dates | Scattered across emails and the factory’s own sheet | Per order, across the whole collection, in one view |
| Costing | A separate spreadsheet, copied from the BOM | On the style, next to the BOM it’s built from |
| Factory updates | WhatsApp messages and calls | Questions and comments on the live style |
| When a spec changes | A new file version, hoping the factory uses it | One live record, every revision logged |
Still finding a factory? Read where to find a clothing manufacturer and what MOQ means for your first order.
Production management is on every plan
Purchase orders, the critical path, costing and delivery tracking are included on every plan, including the free one. Signature is €40 and Bespoke €100 per user per month, billed monthly, with free factory seats and no setup fee.
Production management questions
What is production management in fashion?
Production management is everything between an approved sample and a delivered order: confirming the costing, raising purchase orders, agreeing quantities and delivery dates with the factory, and tracking every milestone so problems show up while there is still time to fix them. Most small brands run it in a spreadsheet tracker; production management software keeps it on the same record as the style itself.
What is a critical path in clothing production?
A critical path (also called a time and action calendar) is the list of milestones a style has to pass before it ships, such as lab dip approval, fit and PP sample approval, bulk fabric in house, production start and ex-factory, each with a planned and an actual date. When one milestone slips, the critical path shows which delivery it puts at risk.
Is Specter OS an ERP?
No. Specter OS is a fashion PLM that runs production through to delivery: costing, purchase orders, quantities, delivery dates and the critical path, next to the tech pack and sample history. Stock, warehousing, wholesale orders and accounting usually sit in an ERP or your e-commerce platform.
Can I manage production across several factories?
Yes. Every style carries its factory, so one collection view shows each style’s factory, quantities, delivery dates and stage together, and each factory sees only the styles you share with it.
Do my factories pay to use Specter OS?
No. On the Signature and Bespoke plans, factory and supplier seats are unlimited and free.
How much does Specter OS cost?
There is a free plan for one user and three styles. Signature is €40 and Bespoke €100 per user per month, billed monthly with no setup fee. Production features are included on every plan.
Run your next production through it.
Three styles free, no credit card. Or book thirty minutes and we’ll walk through it with your own collection.